Thursday, February 11, 2010

Day 18 - Start at HNA2

Date: 11/2/2010

0615 - Met with Matt (Supervisor), George & Peter

0630 - Matt drove me in to the site

0700 - JSA forms

0830 - Cut Unistrut with drop saw

Cut to 400mm in length. Deburr the edges. Drill 12mm hole 20mm away from both ends.

Easy instruction, lots of work.

0930 - Smoko

1230 - Lunch

1300 - Cut Unistrut with different length (450mm)

1500 - Finished

It was raining, or rather drizzling almost for the whole day.

No comments:

Post a Comment