Following Westys and Dave today.
0630 - Check orientation of drain holes.
I was asked to go down the basement to check the orientation of drain holes after we checked on the ground. Total 18 of them. I could only found 17 of them and they were all in the correct direction - facing Port Road.
0900 - Helping Dave to install isolator
Things needed: 20A Single phase Isolator, 25mm grey corrigated conduit, & 25mm plain to screwed adaptor
I was asked by Westys to drive a scissor lift around from the inner building to the front. I was trained to drive one, however I was not very confident to drive one, especially in such a packed environment. Luckily Ted came and told Westys that I didn't have a license to drive one.
1100 - Working on the ducting
1500 - Finished