Everyone, including me, if want Boffa & Russo to pay them, must rock up at the site to fill up the timesheet for last week. Otherwise, will miss the pay for the week. Wednesday is also a day for toolbox meeting.
0600 - Toolbox meeting
0615 - Dug trenches and laid conduits
1200 - Cut conduit and chased concrete floor
Conduits laid were not in centre with the light poles. Concrete floor was chased so that the conduits could be cut to the level of light poles base. I was not allowed to use the hammer drill.
1430 - Blowing cable for the conduits that were just cut
1630 - Finish