To avoid late for work, I rocked up at the site @ 0540 to start work at 0600. It was a cold morning @ 11 degC. It's hard to comprehend such extreme weather sometimes, hot @ day and cold @ night. Nevertheless, it better to be cold than hot.
0600 - Leveled sand. Used wacker to compact sand.
0700 - Attended induction.
0800 - Laid and installed conduits.
1100 - Installed cable between conduits using blower.
One conduit got stucked with concrete. Ben used a metal and hammer to remove the concrete. Fortunately the concrete came out. Otherwise might have to remove the conduits from the concrete block. Phew...
1300 - Lunch time.
An incident happened. A bloke fell on the floor because someone made fun by pulling his chair when he was about to sit. The bloke hit his head and nearly passed out. Everyone in the lunch room was laughing, except me. I thought the joke was too much, too dangerous. Luckily the bloke was fine and didn't make a fuss about it.
1330 - Continue conduit installation and cover up trenches.
1630 - Finished work.